Mid Devon Self-Build Register Data
Mid Devon has an outstanding deficit of 93 plots
Since 2016, 188 people have registered interest in self-build here. Mid Devon has permitted 30 plots.
People on Mid Devon's self build register
Each icon represents one person on the self build register.
People on Mid Devon's self build register
188
How has demand evolved?
The chart below tracks cumulative Part 1 demand, combined Part 1+2 demand, permissions granted, and the total outstanding demand over time.
Summary of Errors Found
- Inconsistent Total Counts vs. Added Numbers (2017-2022): The data set contained significant arithmetic inconsistencies between the "Total Individuals Added" in a given year and the "Total Individuals End of Period".
- 2017: Reported End 35 vs Calculated 30 (Start 14 + Added 16).
- 2020: Reported End 71 vs Calculated 70.
- 2021: Reported End 84 vs Calculated 73 (a large jump not explained by the 3 individuals added).
- 2022: Reported End 120 vs Calculated 122.
- Missing Breakdowns (Part 1 vs Part 2): For years 2016-2022, the breakdown of Part 1 (meeting local connection tests) and Part 2 was missing. As the "Local Connection Test" was listed as false or null during these periods, all individuals and groups were derived as Part 1.
Summary of Corrections
- Recalculation of Running Totals: To ensure data integrity, the Start and End totals for all years were recalculated based strictly on the "Total Individuals Added" figures, starting from 0 in 2016. This method perfectly aligns with the reported totals for 2018 (44) and 2019 (56), suggesting the "Added" figures are the most reliable source of truth. This resulted in a final 2024 End of Period count of 187 (close to the reported 185).
- Part 1 / Part 2 Derivation: All derived totals were assigned to Part 1 fields, with Part 2 fields set to 0, consistent with the lack of a Local Connection Test.
Detailed compliance calculations
The full breakdown of how the deficit is calculated, including how demand carries forward for three years while surplus permissions do not.
| Base Period | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |
| Year | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 |
| Part 1 — Individuals Added | 14 | 16 | 14 | 12 | 14 | 3 | 49 | 43 | 22 |
| Part 1 — Groups Added | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Part 1 — Total Added | 14 | 17 | 14 | 12 | 14 | 3 | 49 | 43 | 22 |
| Part 1 — Cumulative | 14 | 31 | 45 | 57 | 71 | 74 | 123 | 166 | 188 |
| Part 2 — Individuals Added | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Part 2 — Groups Added | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Part 2 — Total Added | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Permissions Granted | 0 | 0 | 0 | 3 | 6 | 3 | 0 | 9 | 9 |
| Permissions — Cumulative | 0 | 0 | 0 | 3 | 9 | 12 | 12 | 21 | 30 |
| Permissions Matched to Base Period | 3 | 6 | 3 | 0 | 9 | 9 | 0 | 0 | 0 |
| Deficit/Surplus for Base Period | -11 | -11 | -11 | -12 | -5 | 6 | -49 | -43 | -22 |
| Unusable Surplus Permissions | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Outstanding Demand | 11 | 22 | 33 | 45 | 50 | 44 | 93 | 136 | 158 |
What's happening each year?
Looking at annual data shows whether registration rates are increasing or decreasing, and how permissions compare to new demand each year.
What policies are in place?
Local authorities can implement various policies that affect self-build. Some restrict who can join the register, while others actively support self-build delivery.
Entry requirements
These policies can limit who is eligible to join the register.
Support measures
Mid Devon has implemented 7 of 8 possible support measures.
Frequently asked questions
Understanding self-build registers and local authority duties.