The National Planning Policy Framework is the document that decides whether land in England can be built on. It was rewritten and republished on 17 August 2026, and the rewrite matters: the new version is more rules-based than the one it replaced, which means for the first time you can reasonably check your own land against it.

This page explains what changed. Every claim on it links to the specific policy, and there is a free tool that applies the whole thing to your land.

01The three changes that matter most

Inside a town or village, the answer starts as yes

There is no longer a list of categories to get through. Development within a settlement should be approved unless the benefits would be substantially outweighed by the harm, and it is for the council to show that. The exceptions are narrow and specific.

Read more

Outside one, there are more doors than before

Seven separate routes can apply to housing outside a settlement, and they are alternatives rather than a hierarchy. Only one has to fit. The widest is that the development addresses an evidenced unmet housing need, and outside the Green Belt that phrase is deliberately open-ended.

Read more

Green Belt land that does no Green Belt job is now easier

Land in the Green Belt that does not strongly serve any of three specific purposes is called grey belt. Protecting open countryside in general is deliberately not one of those purposes, which is what makes the category meaningful rather than empty.

Read more

02The detail most people will miss

The same three words mean two different things depending on where your land is.

“Evidenced unmet need” appears in two places. Outside the Green Belt the framework says including, but not limited to a housing supply failure, so any evidenced shortage can qualify. Inside the Green Belt a footnote says it means a five year supply shortfall or a delivery test failure, and nothing else.

Outside the Green Belt: open

Any evidenced unmet need can qualify. A five year supply failure and a Housing Delivery Test result below 75% are given as examples, not as the limits.

Inside the Green Belt: closed

For housing, restricted to a five year supply shortfall (including any buffer) or a Housing Delivery Test result below 75%. Nothing else counts.

For self-build this is decisive. A council that has not granted enough plots to meet demand on its register is in breach of a statutory duty, and outside the Green Belt that opens a route. Inside it, the same fact does nothing.

The full explanation

03The numbers worth knowing

10 homes or 0.5ha
What counts as major development. Either limb is enough, so a half-hectare site with three houses on it is still major.
800 metres
Reasonable walking distance to a station, or about 10 minutes' walk where a hill or a main road gets in the way.
35 to 45 homes per hectare
The minimum density near a well-connected station, measured on the part you actually build on. Failing it means a refusal.
75%
The delivery test threshold. Below it, the case for new housing sites gets considerably stronger.
1 July 1948
The baseline for measuring whether a Green Belt extension is disproportionate. Outside the Green Belt the baseline is the building as it stands today.
15 percentage points
The Green Belt affordable housing uplift over the existing requirement, capped at 50%. Not a flat 50%, as is often reported.

04Questions answered

Check your own land against all of it

Free, no sign-up, and it tells you plainly what it cannot know. If you would rather talk to someone, the number is on the tool page.

Start the check

Reflects the National Planning Policy Framework (2026), published 17 August 2026. This page last reviewed 18 August 2026. Read the framework.